NEWS
The Prime Minister of the Federal Democratic Republic of Ethiopia, Dr. Abiy Ahmed, today officially started the construction of the Lake Bistima-Chifra asphalt concrete road.
The Prime Minister of the Federal Democratic Republic of Ethiopia, Dr. Abiy Ahmed, today officially started the construction of the Lake Bistima-Chifra asphalt concrete road. Deputy Prime Minister Demeke Mekonnen, Chief of the Regional State Ato Temesgen Tiruneh, Head of the Prosperity Party Office Benalif Andualem, Director General of the Ethiopian Roads Authority, Eng. are invited. The 74.3 km Lake Bistima chifra will be constructed at a cost of over 2.1 billion birr allocated... Read More »
The Eteya-Robe road construction project has begun.
The construction of the project, which will cost 75.6 km at a cost of 1.3 billion birr, is well underway. In the past, road construction has been a source of frustration due to delays in contracting capacity. ERA has revived the road construction activity through an administrative action taken to speed up construction in accordance with the contractor's contract. Currently, work is underway on asphalt paving and plans are underway to pave the 30 km road section by the end of the... Read More »
Dima-Rad road construction project linking Ethiopia to South Sudan completed
The fact that the 60.2 km long asphalt concrete road is being constructed will be of great benefit to facilitate alternative income trade. In addition to facilitating the region's road transport network, the road is also important in facilitating Ethiopia's social, economic and trade relations with South Sudan. The Dima-Rad Bridge road project has a significant role to play in the export of fruits, honey and spices, including coffee, which is the main source of foreign exchange... Read More »
Construction work is underway on the Border Crossing Truck terminal.
Construction work is underway on the Border Crossing Truck terminal. A delegation led by the State Minister of Transport, Kassahun Gofe, and the Director General of the Ethiopian Roads Authority, Mr. Habtamu Tegele, conducted a survey on the construction of a cross-border truck terminal. During the survey, the officials reviewed the overall activities and remaining work on the construction of this cross-border truck terminal, which is expected to help prevent the transmission of CV-19. The... Read More »
Residents who fully paid take part in lottery draw for 40/60 condo schemes’: the mayor
Residents who fully paid take part in lottery draw for 40/60 condo schemes’: the mayor City Administration announced that residents who have fully paid will take part in the lottery draw for the 40/60 condo schemes built at Sengatera and Crown sites. Among 39, 229 condos that are being constructed under 40/60 schemes, 1,292 are fully completed and will be officially inaugurated on the coming Saturday. According to Ato Diriba Kuma, City’s mayor, after the inauguration... Read More »
Manuals And Standard Document
CALL FOR PAPER
HAWASSA -CHUKO
Hawassa-Chuko 66 km asphalt concrete road construction project completed
The Hawassa-Chuko 66 km asphalt concrete road, part of the Mombasa-Nairobi-Addis Ababa road corridor, has been completed.Field recruitment for the overall project was completed on site.The Hawassa-Chuko road, built on asphalt concrete, will significantly reduce travel time and cost by modernizing the towns along the route, agricultural and industrial zones, and tourist attractions.
FINANCIAL TRANSPARENCY & ACOUNTABLITY
- Six Month Accomplishment
- ERA 2013 Approved Capital Budget
- ERA 2013 Approved Capital Budget
- ERA 2013 Approved Capital Budget
- 2013 Six Month Money Usage
— 5 Items per Page